The construction of the Hotel took 3 years and was carried out by us.

It was built in reinforced concrete, a technique chosen due to the geometry of the building and also to the Chilean construction tradition.

Most of the facades are made of exposed concrete. The characteristic texture of this material was made by wood moldings made in the same work.